Quick Links
 
Photo Gallery
Contact Us
 
Join Our Newsletter
 
enter your email address below:


 ICCB Projects 



  • Information Technology - September 2009. Client / JCCI

  • SWAT Compound - September 2009. Client / USACE

  • Police Stations - September 2009 . Client / JCCI

  • Boat & Simulator Repair facilities - September 2009 . Client / JCCI

  • Generators Preventive Maintenance - July 2009 . Client / JCCI

  • Al–Garma Road Paving / Anbar Province – October 2008. Client / JCCI

  • Al-Ghadir ISW Training / Baghdad – September 2008. Client / JCCI

  • Al-Risafa ISW Training / Baghdad – September 2008. Client / JCCI

  • Al-Karadah ISW Training / Baghdad – September 2008. Client / JCCI

  • Tameem ISW Training / Baghdad – September 2008. Client / JCCI

  • Hosaiba Police Station Construction/ Anbar Province - August 2008. Client / JCCI

  • Khalidiyah Court House Construction / Anbar Province – August 2008. Client / JCCI

  • Construction of Bayji Oil Refinery Security Enhancements - June 2007.Client / USACE

  • Taza Sub-Station Hardening – September 2007. Client / USACE

  • Bayji Sub-Station Hardening – September 2007. Client / USACE

  • Construction of a School in Saraway Kharaw - July 2007.Client / USACE
  • Construction of a  School in Said Sadiq - June 2007.Client/ USACE
  • Construction of Bayji Oil Refinery Security Enhancements - June 2007.Client / USACE
  • Construction of 9 Private Health Clinics in Salaheldin, Duhuk & Diyala September - 2006 Client / USACE
  • Security Services for 23 Private Health Clinics sites April 2006 - August 2006. Client / USACE
  • Employment Services Contract – completion 30th June 2005 (renewable) Client / Bechtel.
  • Rehabilitation and Erection of 132kV 58 km power line from Dibis - Erbil. Client / Fluor International.
  • Rehabilitation and Erection of 97 km 400 kV Towers from Baghdad South-East. Client / Fluor International
  • Baghdad International Airport completion . Client / Bechtel
  • Rehabilitation project for 75 Schools in Baghdad. Client / Bechtel.
  • Various renovation projects inside the CPA presidential Palace. Client / Kellogg Brown and Root (KBR/Halliburton).
  • Rehabilitation of part of the Taji 400 kV transmission line. Client / USACE
  • Supply of Caravans and perform onsite as required civil works at Taji & Nasiriyah power plants. Client / Fluor International
  • Supply of Caravans and perform onsite as required civil works at Baghdad International Airport. Client / Raytheon.
  • Engineer for the assessment and supervision of work of the Al Sadr City sewage and water network. Client / Washington International and Black and Veatch Joint Venture.
  • Preparation of Ifraz Water Treatment site in Erbil, and Baghdad Landfill Site. Client / FluorAMEC.
  • Topographical Survey and Geotechnical Investigation of Ifraz Water Treatment site in Erbil, and Baghdad Landfill Site. Client / FluorAMEC
  • Topographical Survey and Geotechnical Investigation of WGI offices in Green Zone, Baghdad. Client / Washington Group International.
  • New model school in Anah in West Anbar province. Client / OICC (SeaBees) later transferred to USACE
  • Supply and install V-Sat systems for Washington Group International. Client / WGI.
  • Provision of security badges to many US firms operating in Iraq.
  • Renovation and reconstruction of phase V army barracks and associated depots for Taji Base. Client / AMEC.
  • Baghdad Landfill site (survey and geotechnical investigation). Client / FluorAMEC.
  • Preliminary assessment of West Baghdad Main Sewer trunk line.Client / FluorAMEC.
  • Access Road for Construction and Demolition Landfill (C&D) for Baghdad Landfill Site. Client / FluorAMEC.
  • Rehabilitation and reconstruction of Wathba Water Treatment Plant (WTP) in Baghdad. Client / FluorAMEC.
  • Rehabilitation and reconstruction of Wahda Water Treatment Plant (WTP) in Baghdad. Client / FluorAMEC.
  • Provisions and Installation of 135,000m2 of Geo-membrane for Baghdad Landfill Site. Client / FluorAMEC.
  • Supply of concrete for Nasiriyah Water Treatment Plants (WTP) and surrounding areas.  Client / FluorAMEC.
  • Construction of 5 (increased to 10) concrete clarifiers for the Nasiriyah WTP.  Client / FluorAMEC
  • Construction of 28 Primary Health Clinics (PHC) in Kurdistan, North Iraq. Client / Parsons BHE.
  • Rehabilitation and reconstruction of Erbil Maternity and Paediatric Hospital, North Iraq. Client / Parsons BHE.
  • Renovation of Raytheon International Systems offices at BIAP. Client / Raytheon.
  • Assessment and Data Collection for Iraq SCADA System. Client / WGI
  • Surface Cleaning of several districts of Al Sadr City. Client / Washington International Black and Veatch Joint Venture.
  • Cleaning and Jetting of main sewer trunk lines in Sadr City.Client / Washington International Black and Veatch Joint Venture.

Recent Projects
- Client / JCCI
Information Technology - September 2009
 
- Client / USACE
SWAT Compound - September 2009
 
- Client / JCCI
Police Stations - September 2009
 
- Client / JCCI
Boat & Simulator Repair facilities - September 2009
 
- Client / JCCI
Generators Preventive Maintenance - September 2009
 

READ ALL

News Flash
- ICCB Office branches within Iraq are in : Tikrit-Salah Al-Din , Ramadi - Anbar , Sulaymaniyah , Baquba - Diyala , Krkuk
2
- ICCB’s turnover from January 2003- January 2009 in excess of $375 million.
2
- We currently employ 300 personnel at our Head Office, 75 of which are engineers with various skills and disciplines, and have invested heavily in infrastructure and machinery in the past 12 months.
2

© All rights reserved. Iraqi Consultants & Construction Bureau - ICCB. 2008